Toggle navigation SEARCH FOR PROPERTY

OR

1200 sqft, 3 Beds Under Construction Apartment/Flats for Sale at Mirpur 10

Mirpur 10, Dhaka

Call for price
Property ID: 234066

OVERVIEW

Property Name
Hyperion Spring Field
Property Type
Apartment/Flats
Property For
Sale
Location
Mirpur 10 , Dhaka
Address
House-82, Borobagh Mirpur-10,Dhaka-1216.
Construction Status
Under Construction
Property Size
1200 sqft
Price Per Sqft
Call for price
Total Price
Call for price
Transaction Type
New
Bed Room
3
Bath Room
3
Floor Number
2nd Floor,
Balconies
2
Garages
Parking 1
Total Floor
7
Furnishing
Furnished
Facing
East Facing
Land Area
7.13 katha
Handover Date
December 06, 2018

Description

Company Name: Hyperion Design & Development Ltd
Office Address: House # 2, Road # 4, Block # A, Mirpur-10, Dhaka-1216

Project Name: Spring Field
Project Address:
Plot -82,Mirpur-10, Dhaka-1216.

1. Building Height: 8 Storied Residential Building,                                                      

2.Apartments Type: A=1200 sft & B=1150sft & C=1085 SFT
3. Flat Arrangement: 3 beds, Living, Dining, Kitchen, 3 Toilets & 2 Verandhas etc.

General Features & Amenities.
4. Architectural design and details by reputed architect.
5. Common Facilities: One imported superior quality 8 passengers lift (HYUNDAI, KORIA) Brand fitted by Mann Bangladesh, sub station & intercom facilities.
6. Number of car parking: 14 nos.
7. Structural design by professional structural engineer.
8. Reinforced cement concrete foundation.
9. Appropriate earthquake safety measurement as per Bangladesh National Building Code-1990 (BNBC).

10. Cement: Locally manufactured Portland cement, e.g. -Scan/ Crown/ Supercrete/ King Brand.11. Steel: TMT 500w MS. deformed bar as per design requirement. (Brand BSRM / KSRM/ AKS /
12. Chips: Stone Chips for foundation, columns and beams as per design requirement. Bricks chips
13. China Mirror Polish floor tiles (24"x24").
14. One European standard standby (30 KVA) generator for emergency power supply serving capacity of entire flats and the load of the lift simultaneously.
15. Lift, Generator, PABX & Pumps up to warranty period.

16. Project Status: up to Completed 2nd Floor .

17. Project Hand Over Date : 30th November,2018

 

                                                                      

                                                               

 

Amenities

Map View

OR

Send Message to Owner

T&C Apply

Similar Properties